PERANCANGAN UKURAN CHOKE PADA SISTEM PRODUKSI LAPANGAN GAS KERING UNTUK MEMENUHI KONTRAK PENJUALAN GAS (PLATEAU RATE)

Undergraduate Theses from JBPTITBPP / 2018-05-16 09:32:26
Oleh : MUHAMMAD AULIA NABIGHA (NIM: 12212003), S1 - Petroleum Engineering-FTTM
Dibuat : 2018-05-16, dengan 1 file

Keyword : perancangan ukuran choke, kecepatan turner, kecepatan pengikisan, modified isochronal test

Laju alir dan tekanan separator pada pengembangan lapangan gas sudah disepakati sejak awal dan harus dipenuhi selama masa kontrak. Karakteristik tersebut mengakibatkan proses pengembangan lapangan gas berbeda dengan pengembangan lapangan minyak. Tekanan reservoir yang tinggi pada masa awal pengembangan akan menghasilkan laju alir dan tekanan masuk separator yang tinggi. Laju alir awal yang terlampau tinggi mengakibatkan penurunan tekanan secara cepat yang berujung tidak terpenuhinya laju alir dalam rentang waktu yang telah disepakati. Tekanan masuk separator yang tinggi akan mengakibatkan separator tidak berfungsi secara optimum. Kedua masalah ini dapat diselesaikan dengan penggunaan choke pada ukuran yang sesuai.

Pada studi ini, akan dilakukan perancangan ukuran choke untuk menjaga laju alir dan tekanan masuk separator. Perancangan tersebut dilakukan dengan simulasi sebuah model lapangan gas dengan dua skema produksi yang berbeda. Proses perancangan dilakukan secara terintegrasi, mulai dari perhitungan cadangan, pengujian performa sumur, perhitungan laju alir minimum untuk mencegah liquid loading, dan perhitungan laju alir maksimum untuk mencegah terjadinya erosi peralatan. Setelah laju alir tiap sumur ditentukan, ukuran choke dapat dihitung dengan menggunakan persamaan aliran saat melewati hambatan yang merupakan kombinasi persamaan Bernoulli dan persamaan keadaan. Kebutuhan pemasangan pemanas akibat efek Joule-Thomson yang terjadi juga di analisa untuk mencegah terbentuknya sumabatan es di choke.

Deskripsi Alternatif :

Production rate and separator pressure in gas field development have been determined early and should have fulfilled during a contract time. That characterictics made gas field development process different with oil field development process. High reservoir pressure at the beginning of field development is resulting high flow rate and high separator inlet pressure. A very high flow rate at the beginning made the pressure decline faster and ended with instability of gas flow rate during the specific contract time. High separator inlet pressure made the separator doesnÂ’t work properly. That two problems can be solved with choke utilization at exact size.

In this study, choke size will be determined in order to keep the stability of the flow rate and separator inlet pressure. Choke size will be designed with a gas field model simulation with two production scheme. Design process will be run integratively, start with reserves calculation, well testing, minimum flow rate calculation to prevent liquid loading, and maximum flow rate calculation to prevent erosion on facilities. After the flow rate of each wells have determined, choke size can be calculates with an equation that combined from Bernoulli equation and equation of state. A heater installation necessity regarding to Joule-Thomson effect will be analized to prevent an ice plugging in choke.

Copyrights : Copyright (c) 2001 by Perpustakaan Digital ITB. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS1 - Petroleum Engineering-FTTM
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Prof. Ir. Pudjo Sukarno, M.Sc., Ph.D, Editor: Suharsiyah

File PDF...