OPTIMASI PEMILIHAN UKURAN PIPA DAN JUMLAH STASIUN POMPA STUDI KASUS: PIPA TRANSMISI MINYAK DARI TEMPINO KE PLAJU

OPTIMIZATION OF PIPE SIZE SELECTION AND NUMBER OF PUMP STATIONS CASE STUDY: OIL PIPELINE FROM TEMPINO TO PLAJU

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:40:50
Oleh : MOHAMAD FIKRI (NIM : 13104112); Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, S1 - Department of Mechanical Engineering
Dibuat : 2009, dengan 7 file

Keyword : Minyak bumi; stasiun pompa; pipeline; sumur minyak; HYSYS; ASME B31.4.

Minyak bumi saat ini merupakan salah satu sumber energi utama dalam pemenuhan kebutuhan sehari-hari umat manusia. Untuk menyalurkan minyak bumi dari sumur-sumur minyak ke bagian proses atau bagian yang lainnya dibutuhkan pipeline yang baik. Pipeline harus dirancang seoptimal mungkin


sehingga dapat menghemat biaya konstruksi, operasional, dan perawatannya.


Pada tugas akhir ini telah dilakukan optimasi pemilihan pipa dan stasiun pompa pada sistem perpipaan transmisi minyak dari Tempino ke Plaju untuk mengganti pipa lama yang sudah banyak mengalami kerusakan dan tidak layak pakai. Optimasi dilakukan dengan pemodelan menggunakan software HYSYS untuk menganalisis profil fluida dan daya pompa yang dibutuhkan, lalu dilanjutkan dengan perhitungan tebal pipa untuk beberapa variasi ukuran diameter pipa. Untuk mendapatkan biaya total terendah, dilakukan perhitungan


biaya instalasi dan operasional. Analisis yang dilakukan mengacu pada code yang mengatur sistem perpipaan untuk penyaluran fluida cair, yaitu ASME B31.4.


Hasil analisis menunjukkan bahwa ukuran pipa yang paling ekonomis adalah NPS 8 inch schedule 40 untuk segmen KM 265 – KM 174, NPS 10 inch schedule 40 untuk segmen KM 174 – KM 122, dan NPS 10 inch schedule 40 untuk KM 122 – KM 3. Jumlah booster station yang paling optimum digunakan untuk sistem perpipaan ini adalah 3 booster station yang terletak KM 265, KM 174, dan KM 77 dengan daya pompa total sebesar 724,34 kW.

Deskripsi Alternatif :

Today, natural oil is one of main energy resource that being used to fulfill human needs. To distribute natural oil from oil wells to plants or other destination, a good pipeline system is needed. Pipeline must be designed as


optimal as possible to make the pipe cost, operational cost, and maintenance cost become minimum.


In this final project, pipe size and number of pump stations of Tempino – Plaju oil pipeline has been optimized in order to replace the existing pipeline that has some major damages. Optimization has been done by HYSYS software to analyze the fluid profile and to find out power of pumps needed, then continued by wall thickness calculation for various diameter of pipes. In order to get the most minimum cost, calculation of installation cost and operational cost has been done. All the analysis is based on ASME B31.4 code that organizes pipeline transportation systems for liquid.


The analysis result shows that the most optimum pipe size is NPS 8 inch schedule 40 for KM 265 – KM 174 segment, NPS 10 inch schedule 40 for KM 174 – KM 122 segment, and NPS 10 inch schedule 40 for KM 122 – KM 3 segment. The most optimum number of booster stations for this pipeline system


is 3 that located at KM 265, KM 174, and KM 77 with 724,34 kW as total of pumps’ power.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, Editor: PKL-SMK

File PDF...