Path: Top > S1-Final Project > Petroleum Engineering-FTTM > 2008

STUDI DELIVERABILITY PRODUKSI GAS DI LAPANGAN "X"

FIELD "X" GAS PRODUCTION DELIVERABILITY STUDY

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:37:31
Oleh : MIFTAH FARID (NIM 12203003), S1 - Department of Petroleum Engineering
Dibuat : 2008, dengan 1 file

Keyword : Gas well Deliverability, AOF, Production Forecasting

Deliverabiliy sumur gas merupakan kemampuan suatu sumur gas untuk memproduksikan gas dengan laju alir dan tekanan tertentu. Untuk menentukan deliverability suatu sumur gas, terlebih dahulu dilakukan pengujian terhadap sumur tersebut (multipoint test). Ada 3 metode yang berkembang dalam melakukan multipoint test , yaitu Back Pressure Test, Isochronal Test dan Modified Isochronal Test. Penggunaan ketiga metode ini akan didapatkan harga Absolute Open Flow Potential (AOF) untuk masing-masing reservoir. Dalam menentukan laju produksi suatu lapangan gas, seringkali digunakan harga rate sebesar 30% dari AOF (rule of thumb). Akan tetapi AOF yang digunakan adalah AOF hasil penjumlahan dari AOF semua lapisan yang akan diproduksikan. AOF hasil penjumlahan ini belum tentu sama dengan AOF lapangan yang sebenarnya. Pada umumnya AOF nyata lebih rendah dibandingkan dengan cara penjumlahan sederhana. Hal ini terjadi karena adanya crossflow gas antar layer. Layer dengan tekanan yang lebih besar akan menekan bahkan menginjeksi layer yang bertekanan lebih rendah. Selain itu crossflow juga dapat terjadi di manifold sehingga sumur yang memiliki tekanan kepala sumur lebih rendah akan mengalami tekanan balik. Demikian juga dengan studi deliverability yang dilakukan di Lapangan gas "X". Saat ini lapangan X berproduksi dengan laju harian rata-rata 140 MMscfd. Dengan mempertimbangkan harga tekanan reservoir saat ini, Lapangan "X" diharapkan dapat ditingkatkan laju produksinya menjadi 200MMscfd. Berdasarkan tujuan tersebut, maka studi ini dilaksanakan agar didapatkan skenario produksi yang sesuai dengan harapan. Dalam pengerjaannya, studi ini menggunakan software gasdel agar dapat dilihat langsung pengaruh dari backpressure yang terjadi.

Deskripsi Alternatif :

Gas Well Deliverability is capability of gas well to produce with certain rate and pressure. before determining deliverability of gas well, well testing is conducted to obtain the Absolute Open Flow Potential (AOF). By using 3 commonly known multipoint test method, the AOF value will be gain layer by layer. During estimating production rate of gas field, its commonly used 30% of AOF value (rule of thumb). The Field AOF is calculated by adding cummulative all AOF of producing layer. This AOF value not absolutely same with practical Field AOF. Generally, the practical AOF field is lower than Field AOF estimated by summation all AOF layer. This phenomena happened because the effect of crossflow between layer. The higher pressure layer will press, even inject, the lower pressure layer. Crossflow also occured in manifold. The crossflow will cause the lower wellhead pressure well suffer backpressure. This phenomena also occurred in deliverability study conducted in "X" gas field. Lately, "X" gas field produce gas with average rate 140 MMscfd. Based on reservoir pressure condition lately, the daily production "X" gas field probably can be increased into 200 MMscfd. Therefore, the study is conducted to get the best production scenario. During this study, gasdel software is used to include the effect of backpressure that occurred.

Copyrights : Copyright Â(c) 2001 by ITB Central Library. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • , Editor: Vika A. Kovariansi

File PDF...