PERANCANGAN PONDASI TIANG BOR DAN DIAPHRAGM WALL MENGGUNAKAN PERKUATAN GROUND ANCHOR SEKOLAH TINGGI PERFILMAN JABABEKA

DESIGN OF BORED PILE FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR JABABEKA FILM INSTITUTE

Undergraduate Theses from JBPTITBPP / 2017-12-07 12:42:20
Oleh : JANNETTA TRI HOTMA SIRAIT (NIM : 15013045), S1 - Civil Engineering-FTSL
Dibuat : 2017, dengan 15 file

Keyword : pondasi tiang bor, penurunan (settlement), diaphragm wall, ground anchor, LPILE, GROUP, PLAXIS 2D, tulangan ; bored pile foundation, settlement, diaphragm wall, ground anchor, LPILE, GROUP, PLAXIS 2D, reinforcement

Sekolah Tinggi Perfilman Jababeka ini memiliki 3 bangunan utama yaitu asrama putra, asrama putri dan gedung sekolah. Gedung asrama terdiri dari 8 lantai dan gedung sekolah terdiri dari 5 lantai utama dan 2 basement. Dua lantai basement disediakan oleh gedung ini untuk menambah lahan parkir. Pondasi tiang digunakan untuk memikul beban dari struktur atas dengan tipe tiang bor. Dinding penahan tanah diaplikasikan untuk memproteksi galian basement. Tugas akhir ini memiliki tujuan untuk mendesain dan menganalisis sistem pondasi tiang dan proteksi galian basement menggunakan dinding penahan tanah.




Pada tugas akhir ini, proyek ini menggunakan 128 buah tiang untuk asrama putra dengan dimensi 800 mm dan kedalaman tiang 19 meter, asrama putri menggunakan 144 buah tiang dengan dimensi 700 mm dan kedalaman tiang 20 meter, dan gedung sekolah menggunakan 550 buah tiang dengan dimensi 900 mm dan kedalaman 11,5 meter. Kelompok tiang didesain dengan menggunakan pile cap. Terdapat 9 tipe konfigurasi kelompok tiang dengan jarak antar tiang 3 diameter. Penurunan kelompok tiang yang terjadi berkisar 0,3 cm dengan nilai penurunan differential yang memenuhi syarat (<1/300). Deformasi terbesar yang terjadi pada kelompok pondasi tiang yaitu 24,2 mm (<25 mm). Pengecekan deformasi menggunakan Ensoft LPILE dan GROUP. Tulangan longitudinal tiang bor menggunakan PCAcol dihasilkan tulangan 12D29, 16D29, 8D25, dan 20D32, untuk tulangan transversal digunakan tulangan spiral D13-40.




Untuk pengaman galian sedalam 7,5 meter (2 basement) digunakan sistem diaphragm wall dan perkuatan ground anchor. Analisis dilakukan secara bertahap dengan menggunakan PLAXIS 2D. Terdapat 1 tahap pemasangan diaphragm wall, 4 tahap galian dan 1 tahap pemasangan ground anchor. Tebal diaphragm wall yang digunakan adalah 0,8 meter dengan kedalaman 12 meter. Satu buah ground anchor digunakan untuk memperkuat diaphragm wall pada elevasi -3 meter dengan ultimate strength 1185 kN dengan gaya prestress 194 kN. Desain galian memenuhi angka keamanan analisis keruntuhan. Desain tulangan diaphragm wall membutuhkan D25-140 untuk momen positif dan negatif, dan D13-150 untuk desain tulangan transversal.

Deskripsi Alternatif :

Jababeka Film Institute has three main buildings, male dormitory, female dormitory and school building. The dorms consist of 8 floors and school building consist of 5 main floors and 2 basement. Two basement floors are provided by this building to increase parking space. Pile foundation is used to bear the load of upper structure with bored type. Retaining wall is applied to protect basement excavation. This final project has purpose to design and analyze system of pile foundation and protection of basement excavation with retaining wall.




In this final project, the foundation configuration use 128 bored piles with 800 mm diameter, applied at 19 meters depth for male dormitory, 144 bored piles with 700 mm diameter, applied at 20 meters depth for female dormitory, and 550 bored piles with 900 mm diameter, applied at 11,5 meters depth for school building. Group piles are designed with pile cap. There are 9 types of groups with 3 diameter distances between piles. The range of group settlement is between 0,3 cm with qualified differential settlement (< 1/300). The largest deformation that occurred in the pile group is 24,2 mm (<25mm). Checking deformation using Ensoft LPILE and GROUP. Longitudinal reinforcements calculated using PCAcol used reinforcements 12D29, 16D29, 8D25, dan 20D32, for transversal used spiral reinforcement D13-40.




For 7,5 meters depth (2 basement), basement protection is used diaphragm wall system and ground anchor. The analysis calculated using PLAXIS 2D with stage construction. There are 1 stage of diaphragm wall installation, 4 stages excavation, and 1 stages of ground anchors installation. The required thickness of diaphragm wall is 0,8 m with 12 m depth. One ground anchor are used to strengthen diaphragm wall at the elevation -3 m, each has 1185 kN with 194 kN prestressed force. The basement excavation occupy all the safety factor of failure analysis. The design of diaphragm wall reinforcement is requires D25-140 for positive and negative moment, and also D13-150 for transversal reinforcement.

Copyrights : Copyright (c) 2001 by Perpustakaan Digital ITB. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS1 - Civil Engineering-FTSL
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id