Path: TopS2-ThesesCivil Engineering-FTSL2010

IDENTIFIKASI PERMASALAHAN DAN ALTERNATIF SOLUSI PENERAPAN SISTEM DELIVERY DESIGN-BUILD PADA PROYEK JALAN NASIONAL DI INDONESIA

IDENTIFY PROBLEMS AND ALTERNATIVE OF SOLUTIONS APPLYING DESIGN-BUILD DELIVERY SYSTEM AT NATIONAL ROAD PROJECT IN INDONESIA

Master Theses from JBPTITBPP / 2017-09-27 15:23:26
Oleh : HANNO HUTAMA (NIM : 25007037);; Pembimbing : Prof.Dr.Ir. Rizal Z. Tamin; Ir. Ima Fatima, M.Eng, S2 - Civil Engineering
Dibuat : 2010, dengan 10 file

Keyword : sistem delivery, Design-Build, penyelenggaraan jalan nasional, organisasi penyelenggara jalan nasional, landasan legal penyelenggaraan jalan.

Sistem delivery Design-Build adalah sistem penyelenggaraan jasa konstruksi dimana hanya satu entitas saja yang melaksanakan kegiatan perencanaan (design) sekaligus kegiatan pelaksanaan (build) dalam satu ikatan kontrak. Saat ini Direktorat Jenderal Bina Marga, sebagai pengelola jalan nasional, berinisiatif menerapkan sistem delivery Design-Build untuk penanganan jalan nasional. Di Indonesia, penyelenggaraan jalan nasional melibatkan beberapa instansi


Pemerintah, yaitu Direktorat Jenderal Bina Marga dan Balai Pelaksanaan Jalan Nasional yang mengatur masalah jalan, serta Departemen Keuangan yang mengatur pendanaan. Namun demikian, dalam pelaksanaan penyelenggaraan tersebut koordinasi tidak berjalan lancar, sehingga menimbulkan permasalahan diantaranya ketidakpastian anggaran. Lemahnya koordinasi antar instansi pengelola jalan nasional (perencanaan, pemrograman, desain, pengadaan, dan konstruksi) juga menjadi penyebab rendahnya mutu jalan nasional. Implementasi sistem delivery Design-Build diharapkan dapat mengatasi masalah koordinasi serta mempercepat proses penyelenggaraan disamping meningkatkan efisiensi. Hambatan dalam menerapkan sistem delivery Design-Build pada proyek jalan nasional adalah ketidaksiapan peraturan dan organisasi pengelola jalan di


Indonesia, karena penerapan sistem delivery Design-Build pada bidang jalan ini merupakan hal yang baru dilingkup oleh Direktorat Jenderal Bina Marga. Tujuan penelitian adalah untuk mengidentifikasi permasalahan serta memberikan


alternatif solusi dalam menerapkan sistem delivery Design-Build pada proyek jalan nasional. Metode yang dilakukan adalah studi literatur, pemodelan alur penyelenggaraan jalan nasional, analisis peraturan perundang-undangan, serta analisis fungsi dan tugas organisasi yang terlibat. Kondisi aktual penyelenggaraan jalan diperoleh melalui kuesioner dan wawancara. Penelitian ini menghasilkan


beberapa alternatif solusi untuk dapat menerapkan sistem delivery Design-Build pada proyek jalan nasional, beberapa poin penting adalah peningkatan peran Balai sampai pada perencanaan dan pemrograman, serta peningkatan kemampuan SDM di SNVT daerah pada perencanaan dan pengawasan. Kedua poin tersebut dinilai penting terkait upaya penerapan sistem delivery Design-Build pada proyek jalan nasional.

Deskripsi Alternatif :

Design-Build delivery system is a system whereby one entity perform both design and construction under one single contract. The present, Bina Marga General Directorate, as the organizer of the national road, have a plan to implement Design-Build delivery system for national road. In Indonesia, the national road management is entangling several government parties, there are Bina Marga General Directorate and Balai of National Road Management who manage the road, also Finance Department who manage the financing problems. However, in progress of management implementation, coordination between involved parties is


not going well, so it caused an impact between uncertainty and budget delay. Besides, the low quality of national road was caused by lack of coordination between the national road organizer (planning, programming, design, procurement, and construction section). Implementation of Design-Build delivery system hopefully able to solved coordination problem and also increasing delivery process besides increasing the efficiency. The obstacles in implementing Design-Build on national road are unprepared regulation and national road organizer, it is because of this Design-Build delivery implementation considered new and never been done in Bina Marga General Directorate. The objectives of this research are to identify problems, also to give an alternative of solutions recommendation in implementing Design Build delivery system at national road project. The methods of this research are literature study, making model of national road delivery, regulation analysis, and analysis of task and function of involved organizations.


Actual condition of road management acquired by questionnaire and interview. This research yield some alternative of solutions to be able to apply Design-Build


delivery system at national road project, some important points are role improvement of Balai up to planning and programming, and human resources improvement in Bina Marga focused on improving planning and observation ability. Both of point are assessed important in the effort of applying Design-Build delivery system at national road project.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Prof.Dr.Ir. Rizal Z. Tamin; Ir. Ima Fatima, M.Eng, Editor: Alice Diniarti

File PDF...