Path: Top > S1-Final Project > Civil Engineering-FTSL > 2015

PERENCANAAN ALTERNATIF PONDASI TIANG BOR PADA GEDUNG RUMAH SAKIT 15 LANTAI

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:25:51
Oleh : ISLAMMY RIZALUDDIN FAUZAL (NIM : 15011030), S1 - Department of Civil Engineering
Dibuat : 2015, dengan 7 file

Keyword : daya dukung pondasi, rumah sakit, pondasi tiang bor, penurunan, penulangan, pile cap, L-PILE, GROUP, pcaColumn, SAFE

Semakin padatnya kota-kota besar di Indonesia berdampak pada lahan yang semakin sempit sehingga bangunan tinggi banyak dipilih sebagai alternatif. Dengan dipilihnya bangunan tinggi sebagai alternatif, maka dibutuhkan pondasi yang memiliki daya dukung tinggi untuk menahan gaya-gaya dari struktur bangunan tersebut, sehingga pondasi tiang dipilih sebagai alternatif. Studi tugas akhir ini mencakup suatu perencanaan pondasi tiang bor pada gedung rumah sakit 15 lantai di Jakarta.


Langkah awal dari perencanaan pondasi ini adalah menentukan parameter tanah yang dapat dilakukan dengan mengumpulkan hasil uji laboratorium maupun lapangan serta dengan menggunakan korelasi. Langkah selanjutnya adalah melakukan pemilihan alternatif pondasi yang digunakan, pada tugas akhir ini digunakan pondasi grup tiang bor dengan diameter 1 meter dan kedalaman 50 meter. Selanjutnya dilakukan perhitungan daya dukung aksial tiang tunggal secara manual dan dilanjutkan dengan perhitungan daya dukung lateral dengan bantuan software L-PILE. Selanjutnya dilakukan analisis grup tiang dengan bantuan software GROUP. Selanjutnya dilakukan desain penulangan pada tiang dengan bantuan software pcaColumn. Kemudian penurunan pada grup tiang dilakukan secara manual dan langkah terakhir yang dilakukan adalah desain pile cap dengan bantuan software SAFE dan dilakukan perhitungan penulangan secara manual

Deskripsi Alternatif :

Increasingly congested major cities in Indonesia have an impact on an increasingly narrow area so that high-rise buildings was chosen as an alternative. By choosing a high rise building as an alternative, it required to choose a foundation that has high carrying capacity to withstand the forces of the structure of the building, so that the pile foundation selected as an alternative. Study of this thesis includes a pile foundation design in building of a 15-story hospital in Jakarta.


The initial steps of planning the foundation is to determine the soil parameters that can be done by collecting the outputs of laboratory and field tests as well as using correlations. The next step is to choose the alternative foundation used, this thesis used the group pile foundation with a diameter of 1 meter and a depth of 50 meters as an alternative. Next, the calculation of the axial bearing capacity of a single pile done manually and proceed with the calculation of lateral bearing capacity with the help of L-PILE software. Then, analysis pile group foundation using GROUP software. Furthermore, design of the reinforcement on the pile group with the help of pcaColumn software. Then a calculation of settlement in the pile group is done manually, and the last step taken is the design of pile cap with the help of SAFE software and reinforcement calculations performed manually.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id