Path: Top » S2-Theses » Civil Engineering » 2008
KAJIAN STRATEGI OPERASI PEMELIHARAAN RUNWAY (Studi Kasus : BANDARA INTERNASIONAL LOMBOK)
Oleh : HENDRA AKWAN PUTRA (NIM 25005026); Pembimbing: Dr.Ir. Muhamad Abduh, S2 - Civil Engineering
Dibuat : 2008, dengan 7 file
Keyword : Manajemen Operasi, Strategi Operasi, make or buy decision, biaya, Operation Management, Operation Strategy, Make or Buy Decision, Expense
Perusahaan yang menggunakan manajemen operasi yang efektif harus mempunyai misi, sehingga ia tahu arah dan tujuannya, dan sebuah strategi operasi digunakan untuk mengetahui bagaimana cara untuk mencapai misi tersebut. Salah satu bentuk strategi operasi adalah menentukan alternatif pelaksanaan pemeliharaan yang dapat dilakukan dengan menyediakannya secara internal (swakelola) atau memperolehnya dari luar (outsource) yang dikenal sebagai keputusan buat atau beli (make or buy decision).
Strategi operasi pemeliharaan bertujuan untuk menentukan alternatif pelaksanaan yang lebih menguntungkan. Penentuan alternatif pelaksanaan pemeliharaan dapat dilakukan dengan pertimbangan finansial dan non finansial. Pertimbangan finansial dilakukan dengan membandingkan biaya dari masing-masing alternatif. Sedangkan pertimbangan non finansial dilakukan dengan pertimbangan kualitas, sumber daya manusia dan pranata hukum yang berlaku. Karya tulis ini merupakan laporan kajian strategi operasi pemeliharaan terhadap Bandara Internasional Lombok. Hasil dari kajian ini diharapkan dapat memberikan gambaran mengenai strategi operasi pemeliharaan runway yang lebih menguntungkan.
Ruang lingkup kajian dalam laporan ini mencakup hal berikut: melakukan kajian strategi operasi pemeliharaan dengan pertimbangan non finansial, yang dilanjutkan dengan kajian strategi operasi pemeliharaan dengan pertimbangan finansial. Metode yang dipakai dalam pertimbangan finansial adalah break even point analysis.
Kegiatan pemeliharaan runway dengan pertimbangan non finansial yang sebaiknya dilakukan dengan alternatif swakelola adalah inspeksi landasan, perbaikan pagar batas, pembersihan sampah lepas, penyapuan landasan, inspeksi object obstacle, dan perbaikan landasan sedangkan yang sebaikanya dilakukan dengan alternatif outsourcing adalah kegiatan overlay landasan. Kegiatan pemeliharaan runway dengan pertimbangan finansial yang sebaiknya dilakukan dengan alternatif swakelola adalah, pengecatan marka landasan sedangkan perawatan saluran drainase, pembersihan rubber deposite dan pemotongan rumput strip landasan sebaiknya dilakukan dengan alternatif outsourcing.
Deskripsi Alternatif :Company that use effective operation management must have mission, so it's can be known its purpose and direction, and operation strategy is used to know way reaches mission. One of form of operation strategy is determines alternative of maintenance execution with provided internally or getting from outside known as make or buy decision.
Operation strategy bent on to determine more advantageous execution alternative. Determination of alternative maintenance execution can be determined with financial and non financial consideration. Financial consideration is conducted by compare to expense of each alternative. Non financial consideration conducted with consideration of quality, human resource, and existing legal force. This paper reports of operation strategy of Lombok International Airport. The result of this study are expected to show operation strategy of maintenance runway that more advantageous.
The scope of this study includes of study of maintenance operation strategy with non financial consideration, as well as financial consideration. Method than used in financial consideration is break even point analysis.
According to analysis result, maintenance activity according to non financial consideration that better conducted with provided internally is inspection of runway, repair hedge of runway, sweeping runway, inspection object obstacle, and repair runway, and maintenance activity that better conducted with getting from outside is overlay runway. Maintenance activity according to financial consideration that better conducted with provided internally is painting sign of runway and maintenance activity that better conducted with getting from outside such as maintenance of drainage, clean rubber deposite, and grass cutting.
Beri Komentar ?#(0) | Bookmark
| Properti | Nilai Properti |
|---|---|
| ID Publisher | JBPTITBPP |
| Organisasi | S2 - Civil Engineering |
| Nama Kontak | Drs. Mahmudin, SIP. |
| Alamat | Jl. Ganesha 10 |
| Kota | Bandung |
| Daerah | Jawa Barat |
| Negara | Indonesia |
| Telepon | 62-22-2509118, 2500089 |
| Fax | 62-22-2500089 |
| E-mail Administrator | digilib@lib.itb.ac.id |
| E-mail CKO | digilib@lib.itb.ac.id |
Print ...
Kontributor...
- Pembimbing: Dr.Ir. Muhamad Abduh, Editor: Vika A. Kovariansi
Review...

File : 2008 TS PP HENDRA AKWAN PUTRA 1-COVER.pdf
(587519 bytes)

File : 2008 TS PP HENDRA AKWAN PUTRA 1-BAB 1.pdf
(769861 bytes)

File : 2008 TS PP HENDRA AKWAN PUTRA 1-BAB 2.pdf
(824675 bytes)

File : 2008 TS PP HENDRA AKWAN PUTRA 1-BAB 3.pdf
(615364 bytes)

File : 2008 TS PP HENDRA AKWAN PUTRA 1-BAB 4.pdf
(1076030 bytes)

File : 2008 TS PP HENDRA AKWAN PUTRA 1-BAB 5.pdf
(535477 bytes)

File : 2008 TS PP HENDRA AKWAN PUTRA 1-PUSTAKA.pdf
(534448 bytes)