Path: Top > S1-Final Project > Petroleum Engineering-FTTM > 2013

STUDI PENGGUNAAN DUAL ELECTRIC SUBMERSIBLE PUMP (DESP) SEBAGAI METODE PENGANGKATAN BUATAN PADA SUMUR DENGAN KOMPLESI DOWNHOLE WATER SINK

Undergraduate Theses from JBPTITBPP / 2017-12-21 09:08:12
Oleh : HARYO ANINDITO (NIM : 12209044), S1 - Petroleum Engineering-FTTM
Dibuat : 2013, dengan 1 file

Keyword : downhole water sink (DWS), metode pengangkatan buatan, dual electric submersible pump (DESP)

Downhole water sink (DWS) merupakan komplesi yang dikembangkan untuk mencegah terjadinya water coning, dengan memproduksikan air dari perforasi di bawah water oil contact (WOC) dan air dari perforasi di zona minyak secara beramaan. Terbatasnya tekanan reservoir maupun productivity index pada sumur dengan komplesi DWS dapat menyebabkan produksi minyak menjadi tidak ekonomis. Metode dual electric submersible pump (DESP) yang diajukan pada tugas akhir ini bertujuan untuk mengatasi masalah tersebut. Instalasi ESP akan meningkatkan tekanan dari fluida produksi, memungkinkan peningkatan drawdown sumur dan menyediakan tenaga tambahan yang dibutuhkan minyak maupun air untuk mengalir menuju permukaan. Dalam studi ini dilakukan studi kelayakan dan diajukan prosedur desain DESP untuk sumur dengan komplesi DWS. Terdapat dua konfigurasi DESP yang digunakan pada tugas akhir ini, yaitu konfigurasi tubing konsentrik dan konfigurasi commingled. Hasil dari desain DESP adalah kombinasi ESP dan Bypass tubing untuk laju alir yang ditentukan, dengan mempertimbangkan jumlah stages, efisiensi total, dan kebutuhan daya Aplikasi DESP pada suatu contoh lapangan menunjukkan peningkatan laju produksi minyak dari semula 79.4 BOPD pada komplesi DWS konvensional menjadi 600 BOPD pada konfigurasi tubing konsentrik dan 755.5 BOPD pada konfigurasi commingled. Masing-masing konfigurasi memiliki efisiensi total sebesar 26.64% dan 29.54%. Dalam tugas akhir ini juga diajukan matriks pemilihan bypass tubing untuk berbagai ukuran ESP dan casing.

Deskripsi Alternatif :

Downhole Water Sink (DWS) completion prevent water coning problem by concurrently producing water from bottom completion below the water oil contact, and oil from another completion at the oil zone. This method of completion might results in uneconomical oil production rate due to low reservoir pressure and/or low productivity index (PI). To overcome this issue, this paper introduces dual electric submersible pump (DESP) as artificial method in DWS completion well. ESPs boost the pressure of the produced fluid, allowing an increase in the well drawdown and providing the additional energy required by both oil and water to flow to the surface. This paper presents a feasibility study and design procedures for Dual ESP application in DWS well. Two DESP configurations were explored, concentric tubing configuration and downhole commingled configuration. The results of the design are the combination of ESP and ByPass tubing, by considering the number of stages, total efficiency, and required power for both pumps. Using data from actual field, a comparison study was conducted. The results indicate that Dual ESP would increase the oil production rate from 79.4 BOPD in conventional DWS well to 600 BOPD with total efficiency

of 26.64% for concentric tubing configuration and 755.5 BOPD for commingled configuration. This paper also presents bypass tubing selection matrix for several casing size.

Copyrights : Copyright (c) 2001 by Perpustakaan Digital ITB. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Prof. Ir. Pudjo Sukarno, M.Sc., Ph.D, Editor: Alice Diniarti

File PDF...