Path: Top » S2-Theses » Civil Engineering » 2007
ANALISIS SIGNAL SIGNAL GPR 400 MHz PADA BAJA TULANGAN YANG MENGALAMI KOROSI
ANALISYS OF GPR SIGNALS WITH 400 MHz FREQUENCY ON CORRODED STEEL BAR
Master Theses from JBPTITBPP / 2012-06-04 15:28:22Oleh : Franky Damora (NIM 25004017), S2 - Civil Engineering
Dibuat : 2007-00-00, dengan 8 file
Keyword : GPR, corrosion, reflected waveform, two way travel time, velocity of electromagnetic wave, peak amplitude, relative dielectrict constant of concrete
Subjek : Civil Engineering
Kepala Subjek : Engineering
ABSTRAK:
Pada penelitian ini, dilakukan investigasi terhadap spesimen balok beton bertulang menggunakan ground penetrating radar (GPR) dengan frekuensi 400 MHz saat baja tulangan belum mengalami korosi dan saat baja tulangan telah mengalami korosi. Signal signal GPR yang diperoleh selanjutnya dianalisis untuk; mengidentifikasi bentuk gelombang yang dipantulkan (reflected waveform), mengetahui pengaruh klorida terhadap bentuk gelombang yang dipantulkan pada baja tulangan yang mengalami korosi, mengetahui amplitudo puncak dan waktu tempuh dua arah (two way travel time) bentuk gelombang yang dipantulkan pada baja tulangan yang mengalami korosi dengan kedalaman dan tingkat korosi yang bervariasi, dan memperoleh nilai nilai konstanta dielektrik relatif beton sebelum dan setelah baja tulangan mengalami korosi.
Benda uji yang dipersiapkan untuk penelitian ini terdiri atas tiga buah balok beton bertulang. Benda benda uji tersebut adalah; dua benda uji dengan konfigurasi berdasarkan Standard Method Test ASTM Designation G 109 92 yang dibuat dengan adukan beton biasa tanpa larutan NaCl, dan dengan ditambah larutan NaCl sebesar 2 persen, benda uji konfigurasi khusus dengan enam buah baja tulangan pada kedalaman yang bervariasi yang dibuat menggunakan adukan beton biasa tanpa larutan NaCl. Proses korosi baja tulangan dilakukan dengan memberi arus DC dalam lima periode. Pengumpulan data dengan GPR dilakukan setelah pemberian arus pada setiap periode.
Analisis signal signal GPR memperlihatkan waktu tempuh dua arah atau kecepatan rambat gelombang elektromagnetik meningkat pada setiap periode proses korosi yang disebabkan oleh bagian-bagian besi yang teroksidasi yang berada pada beton di sekitar baja tulangan. Amplitudo puncak pada baja tulangan juga mengalami peningkatan pada setiap periode pengkorosian yang diakibatkan oleh penurunan konduktifitas beton. Peningkatan waktu tempuh dua arah gelombang elektromagnetik mengindikasikan peningkatan konstanta dielektrik relatif beton selama proses korosi.
ABSTRACT:
Concrete block with embedded steel bar spesimens have been investigated using GPR (ground penetrating radar) with 400 MHz frequency in this research. GPR signals are acquired when steel bars are in good condition and when steel bars are corroded. These signals are analized to identify the reflected waveform, to figure out the effect of chloride on reflected waveform on corroded steel bars, to figure out the peak amplitude and two way travel time of reflected waveform on corroded steel bars with variation in depth and corrosion rate, and to obtain relative dielectrict constant values of concrete before and after corrosion.
Three concrete block specimens have been prepared in this research, these are; two specimens with configuration based on Standard Method Test ASTM Designation G 109 92 that are made of normal concrete mixture without NaCl solution and with 2percent NaCl solution, and specimen with special configuration and six steel bars embedded in different depth that is made of normal concrete mixture without NaCl solution. Accelerated corrosion is conducted on steel bars by applying the DC current in five sequence of periodes. GPR signals are collected after corrosion process of each periode.
The analisys of GPR signals shows that two way travel time or velocity of electromagnetic wave increases in every periode of corrosion process due to parts of oxided iron in concrete surrounding steel bars. Peak amplitude on steel bars also increases in every periode because of descending of concrete conductivity. The increasing of two way travel time or velocity of electromagnetic wave indicates the increasing of relative dielectric constant of concrete during corrosion process.
Copyrights : Copyright (c) 2007 FTSL ITB, Information Dissemination Right @ 2007 ITB Central Library, Jl. Ganesha 10 Bandung, 40132, Indonesia. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.
Beri Komentar ?#(0) | Bookmark
| Properti | Nilai Properti |
|---|---|
| ID Publisher | JBPTITBPP |
| Organisasi | S2 - Civil Engineering |
| Nama Kontak | Drs. Mahmudin, SIP. |
| Alamat | Jl. Ganesha 10 |
| Kota | Bandung |
| Daerah | Jawa Barat |
| Negara | Indonesia |
| Telepon | 62-22-2509118, 2500089 |
| Fax | 62-22-2500089 |
| E-mail Administrator | digilib@lib.itb.ac.id |
| E-mail CKO | digilib@lib.itb.ac.id |