Path: Top > S2-Theses > Business Administration-SBM > 2013

ANALISIS RISIKO OPERASIONAL PADA PELEBURAN UNIT METALURGI - PT TIMAH (PERSERO, Tbk

Master Theses from JBPTITBPP / 2017-09-27 15:31:09
Oleh : EBBI WIBISANA (NIM : 29111417) Thesis Advisor : Prof. Dr. Sudarso Kaderi Wiryono, S2 - Business Administration
Dibuat : 2015, dengan 6 file

Keyword : Keywords : Smelting Operational Risk, Backlog, Operational Risk Management System, Furnace Day

ABSTRAK



Operasional peleburan dan pemurnian merupakan tahapan akhir dari rangkaian aktivitas penambangan timah di


PT Timah (Persero) Tbk. Keberhasilan proses peleburan akan menghasilkan penjualan timah sebagai keuntungan perusahaan. Pada kenyataannya operasional peleburan menghadapi risiko-risiko operasional yang akan menimbulkkan penyimpangan dari target yang telah ditetapkan. Pengaruh dari dampak risiko adalah meningkatnya biaya peleburan dan menurunkan perolehan logam timah. Data mengenai tingkat kemungkinan dan dampak dari risiko operasional diperoleh dari kuesioner yang disebarkan kepada beberapa staff peleburan yang dianggap mempunyai pemahaman yang cukup mengenai proses peleburan. Analisa risiko dilakukan dengan melakukan pemetaan kemungkinan dan dampak dari masing-masing risiko untuk menentukan urutan prioritas penanganan sebagai dasar manajemen untuk pengambilan keputusan. Keluaran dari penulisan proyek akhir ini diharapkan adalah keberlangsungan operasional dengan biaya yang terkontrol dan sebagai studi awal untuk mengembangkan sistem manajemen risiko di Unit Metalurgi – PT Timah ( Persero ) Tbk.



Kata kunci : Risiko Operasional Peleburan, Backlog, Sistem Manajemen Risiko Operasional, Hari Tanur

Deskripsi Alternatif :

ABSTRACT



Smelting is a final step of integrated mining activities at PT Timah (Persero) Tbk. The success of smelting process will be resulting in tin metal selling as company revenue. In realization activities always face some operational risk that will deviate from the smelting objective. The influence of the risk impact is the increasing of the smelting cost and lowering tin metal recovery. The information data of the level on possibility and impact operational risk are acquired by questionnaire distributed to the smelting staff which have enough understanding of smelting process. The analysis is conducted by mapping the risk’s possibility and impact to asseses the priority handling as the base of management concerned.The output of study are continuity smelting operation with controllable cost and as preliminary study to develop operational risk management in Metallurgy Unit – PT Timah ( Persero ) Tbk.



Keywords : Smelting Operational Risk, Backlog, Operational Risk Management System, Furnace Day

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Thesis Advisor : Prof. Dr. Sudarso Kaderi Wiryono, Editor: Wiwik Istiyarini

File PDF...