Path: Top > Member > hidayat@unix.lib.itb.ac.id

PERANCANGAN METODE PELAKSANAAN KONSTRUKSI PROYEK SEKOLAH TINGGI PERFILMAN JABABEKA

CONSTRUCTION PLANNING METHOD OF JABABEKA FILM INSTITUTE

Undergraduate Theses from JBPTITBPP / 2017-12-08 07:29:01
Oleh : DISTA FILDZAH AMALINA (NIM : 15013143), S1 - Civil Engineering-FTSL
Dibuat : 2017, dengan 13 file

Keyword : Metode konstruksi, kuantifikasi volume pekerjaan, produktivitas, durasi pekerjaan ; conctruction method, quantity take off, productivity, duration of work

Sekolah Tinggi Perfilman Jababeka merupakan fasilitas pendidikan khususnya untuk pengembangan industri kreatif yang berlokasi di kota Jababeka, Jawa Barat, Indonesia. Untuk dapat merealisasikan proyek ini, maka diperlukan suatu perancangan metode pelaksanaan konstruksi. Perancangan ini penting sebab berkaitan langsung dengan penentuan durasi dan biaya konstruksi proyek terkait.
Dalam perancangan metode pelaksanaan konstruksi, terdapat 6 pekerjaan utama: pekerjaan persiapan, pekerjaan tanah, pekerjaan dan dinding penahan tanah, pekerjaan struktur, pekerjaan drainase dan kolam retensi, serta pekerjaan perkerasan taman parkir yang menggunakan jenis perkerasan lentur.

Perancangan metode pelaksanaan ini dimulai dengan pembuatan work breakdown structure, kemudian dilanjutkan dengan perhitungan kuantifikasi volume pekerjaan sesuai dengan gambar dan spesifikasi proyek, serta perhitungan produktivitas dan durasi. Sementara itu, perhitungan durasi dilakukan berdasarkan dua faktor yaitu produktivitas alat berat dan produktivitas tenaga kerja. Perencaan penjadwalan yang dilakukan dengan menggunakan software Ms.Project menghasilkan durasi selama 353 hari dengan total jam kerja 325.664 jam.

Deskripsi Alternatif :

Jababeka Film Institute is an education facilities especially for Indonesia’s creative industry development where located in Jababeka City, West Java, Indonesia. In order to realize the project of Jababeka Film Institute, it requires a construction planning method. Those conctruction planning method has a very important role in the design since it will be a reference in determining the duration and total cost of the project.

In making the construction planning method, there are 6 major of work: preparation work, earthwork, foundation and retaining wall, building structure, drainage and retention pond, also flexible pavement of parking garden area. The conctruction planning method begins with determining the work breakdown structure, followed by calculating the volume of work based on the drawings and specifications, also calculating the productivity and duration of work. Meanwhile there are two factors that affect the duration of work which are heavy equipment’s productivity and worker’s productivity. This project schedule which design is made by using Ms.Project, gives 353 days or 325,664 hours as the duration of work.

Copyrights : Copyright (c) 2001 by Perpustakaan Digital ITB. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Prof. Dr. Ir. Puti Farida Marzuki, Editor: hidayat