STUDI KEEKONOMIAN LAPANGAN X DAN Y

PLAN OF DEVELOPMENT STUDIES OF X AND Y FIELDS

Master Theses from JBPTITBPP / 2017-09-27 15:07:44
Oleh : DEVIQ AFRIZON (NIM : 22210049), S2 - Petroleum Engineering
Dibuat : 2013, dengan 8 file

Keyword : Keekonomian, Bagian Pemerintah, Bagian Kontraktor, Cost Recovery, Penerimaan Negara

Minyak dan gas bumi sampai saat ini masih memegang peranan yang sangat penting dalam menopang pembangunan di Indonesia dan juga penggerak pertumbuhan yang ditunjukkan dengan memberikan kontribusi rata-rata sebesar kurang lebih 20,7% dari seluruh penerimaan Negara atau sebesar 272 trilyun rupiah. Perkembangan eksplorasi menghadapi suatu kenyataan bahwa penemuan cadangan baru relatif lebih lambat dan menjadi cukup sulit karena target eksplorasi dihadapkan pada daerah-daerah yang semakin sulit baik secara infrastruktur maupun geografis (frontier area). Terkait hal tersebut kadang diperlukan terms and conditions yang baik untuk dapat menarik investasi.


Penelitian ini bertujuan untuk mengkaji suatu lapangan dengan menggunakan data dan asumsi yang digunakan seperti produksi komulatif, biaya kapital dan operasional, harga minyak dan gas dan eskalasinya serta bagian Pemerintah dan bagian Kontraktor (split) yang diambil dari data keekonomian Lapangan X dan Y sebagai input. Output yang didapat adalah beberapa indikator keekonomian seperti Net Present Value (NPV), Internal Rate of Return (IRR), Pay Out Time (POT) dan Profitability Index (PI) serta Bagian Pemerintah.


Dari hasil studi Lapangan Xdan Y didapat estimasi besar cadangan awal untuk gas sebesar 149,7 BSCF dan minyak sebesar 42,76 MMSTBO. Dengan menggunakan beberapa skenario dan berdasarkan skenario yang terbaik didapatkan perkiraan cadangan terambil untuk gas sebesar 103,60 BSCF dengan adanya kandungan pengotor berupa CO2, Nitrogen dll dengan rata-rata sebesar 8,8% maka kumulatif gas bersih sekitar 94,48 BSCF dan minyak sebesar 6,19 MMSTBO.


Berdasarkan asumsi minyak bumi 90 US$/bbl dan 6 US$/mcf dengan eskalasi 3% dan discount rate 10% didapatkan IRR sebesar 14.71% dengan distribusi revenue dari Net Contraktor Share sebesar US$ 185,228 M (14.85%) dan Cost Recovery sebesar US$ 534,758 M (42.86%) dan Total Government Share sebesar US$ 527,604 M (42.29%). Dari hasil evaluasi tersebut didapatkan dengan menggunakan beberapa skenario tersebut penerimaan negara dapat ditingkatkan melebihi 40% dan diharapkan Pemerintah dapat menentukan kebijakan terhadap pengembangan lapangan selanjutnya sehingga tidak terlalu merugikan Negara.

Deskripsi Alternatif :

Oil and gas is still a very important role in supporting development in Indonesia and also stimulus that indicated by contributing an average of approximately 20.7 % of total revenues for the State or 272 trillion rupiah. Exploration progress face the fact that the new reserves discoveries relatively slower and quite difficult because of the exploration target are faced with infrastructure and geographical (frontier areas). Related to this, sometimes necessary to make good terms and conditions either to be able to attract investments.


This study aimed to examine a field by using the data and assumptions used as cumulative production, capital and operating costs, oil and gas prices and escalation as well as part of the Government Take and the Contractor Share (split) that economic data is taken from Field X and Y as input. The output obtained is some economic indicators such as Net Present Value (NPV), Internal Rate of Return (IRR), Pay Out Time (POT) and Profitability Index (PI) as well as the Government Section. From results of studies, field X and Y obtained for the estimation initial gas in place of 149.7 BSCF and initial oil in place of 42.76 MMSTBO. By using multiple scenarios and the best available estimates for gas reserves are proven by 103.60 BSCF with the impurity content in the form of CO2, Nitrogen etc. with an average of 8.8 %, the cumulative net gas by 94.48 BSCF and oil reserves are proven by 6.19 MMSTBO. Based on the assumption of petroleum 90 US$/bbl and 6 US$/mcf with escalation of 3 % and discount rate of 10 % is obtained IRR of 14.71 % of net revenue distribution Contractor Share of 185.228 MUS$ (14.85%) and Cost Recovery for 534.758 MUSS$ (42.86 %) and Total Government Take of 527.604 MUS$ (42.29 %).


The evaluation of the results obtained by using some of these scenarios can be increased state revenues exceed 40 % and the government is expected to set policy for the development of the next field so as not to adverse State.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Dr. Ir. Arsegianto, Editor: PKL-SMK

File PDF...