Path: Top > S2-Theses > Civil Engineering-FTSL > 2007

STUDI POTENSI DAN PEMANFAATAN AIR ANAK SUNGAI BUNGIN UNTUK PEMBANGKIT LISTRIK MIKRO HIDRO (PLTMH) KAB. ENREKANG PROP. SULAWESI SELATAN

THE STUDY OF POTENTIAL AND USES OF BINGIN TRIBUTARY WATER FOR MICRO HYDROPOWER (MHP) IN ENREKANG REGENCY-SOUTH SULAWESI PROVINCE

Master Theses from JBPTITBPP / 2017-09-27 15:23:29
Oleh : Chaidar Buli (NIM 95005327), S2 - Civil Engineering
Dibuat : 2007-05-00, dengan 8 file

Keyword : Water resource potential, Water availability, Net Head and Energy Potencyal
Subjek : Civil Engineering
Kepala Subjek : Engineering

ABSTRAK:




Air adalah sumber kehidupan dan memegang peranan penting dalam menunjang berbagai aktifitas manusia. Berkembangnya suatu negara erat kaitannya dengan kemampuan penyediaan energi terutama energi kelistrikan. Untuk memenuhi kebutuhan tersebut, manusia berusaha menciptakan sumber sumber-sumber energi listrik terbaru yang secara teknis dan ekonomis menguntungkan. PLTMH sesuai dengan namanya, mengandalkan sumber energinya pada tenaga air. Dengan melihat keadaan topografi, geografi dan klimatologi di negara kita khususnya di daerah penelitian mempunyai potensi yang cukup besar untuk dimanfaatkan sebagai pembangkit listrik tenaga air.




Lokasi penelitian merupakan salah satu desa yang ada di Kab. Enrekang Prop. Sulawesi Selatan dan salah satu Sub DAS kecil yang berada di kawasan ini dengan luas daerah tangkapan 266 km2 yaitu Sub DAS Bungin yang merupakan suatu potensi sumber daya air untuk memenuhi kebutuhan listrik desa.




Curah hujan setiap tahun jumlahnya cukup besar berkisar antara 1057-2348 mm. Metoda yang dipakai untuk menganalisis ketersediaan air adalah dengan metoda F.J Mock, dimana metoda ini mensimulasikan kesetimbangan air bulanan pada suatu catchment area tertentu yang ditunjukkan untuk menghitung total run-off dengan menggunakan hujan bulanan, evapotranspirasi, kelembaban tanah dan persediaan air tanah.




Ketersediaan air rata-rata per tahunnya di Sub DAS Bungin sebesar 4,70 m3/det, sedangkan kebutuhan air untuk pembangkit hanya 325 lt/det dengan kapasitas daya bangit listrik 73 kW, ini menunjukkan bahwa masih terjadi kelebihan air di Sub DAS Bungin (surplus).




PLTMH Tanete memanfaatkan debit sebesar 325 lt/det dengan tinggi jatuh efektif 32,9 m. Air yang berasal dari Sungai Perak di alirkan saluran pembawa sepanjang 425m ke bak penenang. Lokasi rumah pembangkit PLTMH ke pusat beban terdekat di Desa Tanete adalah 1000 m. Jaringan dan distribusi sepanjang 5,5 km.

Deskripsi Alternatif :

ABSTRACT:




Water is the source of life and play an important part in supporting various human actifity. Expanding of it an hand in glove state of its ready bearing ably energy especially energy of electrical. To fulfill the requirement, human try to create the source of newest electrics energy gian technical and electrical. MHP as according to its name, reliing on its source to water power, base on the topography, climatology and geography in our state specially in research area which have big enough potency to be exploited as water power station.




The location of research represent one of the countryside exist in Enrekang regency-South Sulawesi province and one of the Sub-Watershed which reside in this area broadly covering area of 266 km2, Bungin Sub-Watershed representing a water resource potency to fulfill requirement of countryside electrics.




The omount of yearly is sufficient with range from 1057-2348 mm. The method which used to analyze the availibility of water is F.J Mock method, where this method is simulating the balance of monthly water at one particular certain catchment area to calculate total of run-off by using monthly rain, evapotranspiration, soil moisture of land and ground water supply.




Availibility of mean water per its year in Bungin Sub-Watershed equal to 4,70 m3 /sec, while amount of water required for the generating of only 325 lt / sec with electrics energy capacities 73 kW, it shows that are surplus of water in the basin. (surplus).




MHP Tanete exploit debit equal to 325 lt/sec with highly fall effective 32,9 m. Water which come from Perak River conducted carrier channel as long as 425 m to head tank. The location of Micro Hydro Power (MHP) to the nearest network is countryside Tanete is 1000m. And distribution network as long as 5,5 km.

Copyrights : Copyright (c) 2007 FTSL ITB, Information Dissemination Right @ 2007 ITB Central Library, Jl. Ganesha 10 Bandung, 40132, Indonesia. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing: Joko Nugroho, Dr., S.T., M.T.




    Scanner: Arnaz Driyastika M.




    (2007-12-03) , Editor: driyastika

File PDF...