Path: Top > S1-Final Project > Environmental Engineering-FTSL > 2018

PRA-RANCANG INSTALASI PENGOLAHAN SAMPAH DI TPA NANGKALEAH, KABUPATEN TASIKMALAYA, JAWA BARAT

PRE-DESIGN OF SOLID WASTE TREATMENT PLANT AT NANGKALEAH DISPOSAL SITE, TASIKMALAYA DISTRICT

Undergraduate Theses from JBPTITBPP / 2018-06-28 16:07:10
Oleh : Bilqis Rulista Al-Zahra (NIM : 15314043), S1 - Environmental Engineering-FTSL (bilqisrulista@gmail.com)
Dibuat : 2018-06-28, dengan 1 file

Keyword : instalasi, organik, pengolahan, pra-rancang, sampah, TPA

Abstrak : Instalasi pengolahan sampah direncanakan akan dibangun di TPA Nangkaleah, Kabupaten Tasikmalaya, Jawa Barat sebagai upaya reduksi sampah yang ditimbun dalam lahan uruk. Dewasa ini, sekitar 101,3 m3 sampah masuk ke TPA tanpa pemilahan setiap harinya yang berasal dari 14 kecamatan. Sekitar 14 kecamatan lainnya di Kabupaten Tasikmalaya belum menerima pelayanan pengelolaan sampah karena keterbatasan lahan dan armada pengangkut. Peningkatan timbulan sampah harus diimbangi dengan lahan uruk yang saniter dan memiliki usia layan yang panjang. Salah satu upaya dalam mengurangi timbulan limbah yang diuruk di TPA yaitu dengan daur ulang sampah. Upaya ini merupakan cara yang cukup efektif dalam pengelolaan sampah di Indonesia dan mengarahkan pada circular economy. Instalasi pengolahan sampah yang direncanakan akan mengurangi sampah yang masuk ke TPA Nangkaleah sebanyak 20% dengan evaluasi peningkatan kapasitas untuk lima tahun sekali. Perencanaan instalasi ini dimulai dengan tahapan pengambilan data primer untuk mengetahui komposisi dan timbulan sampah yang masuk ke TPA Nangkaleah berdasarkan SNI 19-2964-1995 dan juga data sekunder. Selain itu, penentuan alternatif terpilih dilakukan berdasarkan penilaian lima kriteria seleksi dan diselesaikan dengan tahapan perhitungan dan desain instalasi. Kegiatan yang dilakukan dalam instalasi pengolahan sampah diantaranya pemilahan semi-otomatis, pengolahan sampah organik sebanyak 54.11% akan diolah dalam Anaerobic Digester yang didesain berdasarkan SNI 7826:2012, dan sampah anorganik akan diolah sebagaimana potensi daur ulang yang dimiliki. Proses pengolahan sampah pada instalasi menghasilkan material daur ulang yang telah terpilah memiliki kapasitas sekitar 182.42 ton per hari. Jenis sampah anorganik yang diolah diantaranya: sampah plastik menjadi biji plastik, sampah kertas menjadi kertas daur ulang, sampah kain dan karet akan menjadi serbuk sebagai bahan baku, serta pengolahan sampah logam dan kaca dilakukan dengan menghancurkannya menjadi potongan kecil sebagai bahan baku. Dari perhitungan desain dari setiap unit teknologi yang akan dirancang, dibutuhkan total luas lahan yang untuk instalasi pengolahan sampah di TPA Nangkaleah sebesar 0,7 Ha.

Deskripsi Alternatif :

Abstract: The planning of solid waste processing installations would be built on Nangkaleah Disposal Site, Tasikmalaya, West Java as an effort to reduce the waste that dumped in disposal site. Currently, about 101.3 m3 of waste from 14 subdistricts goes to disposal site without sorting. Around other 14 subdistrics in Tasikmalaya have not received waste management services due to lack of land for accommodating all wastes and lack of transportation for collecting it. The increasing of waste generation should be balanced with the sanitary landfill and also have a long life. One of the efforts in reducing the waste that should be disposed to the landfill is recycling. It effectively in waste management in Indonesia and directing on the circular economy. The planning of solid waste processing installations would reduce the waste that disposed to landfill as much as 20% per day by the evaluation of increasing capacity building every five years. This installation planning begins with collecting primary data to determine the composition and amount of waste generation that dumped to Nangkaleah Disposal Site based on SNI 19-2964-1995 also for collecting secondary data. In other hand, the selection of selected alternatives based on the assessment of the five selection criteria and completed with the calculation and installation design steps. The activities on the installation of waste treatment including sorting in semi-automatic, processing organic waste as much as 54.11% would be processed in a typical analysis for Digester Anaerobic, and inorganic waste will be processed as a recycling potential. Inorganic waste treated includes: plastic waste into plastic trash, seed paper to recycled paper, waste cloth and rubber would be a powder as raw material, as well as the processing of waste metal and glass would be destroyed to be fine grain as a raw material. The total area of land required for the installation of the processing of waste in landfill Nangkaleah is about 0.7 Ha

Copyrights : Copyright (c) 2001 by Perpustakaan Digital ITB. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Dr. I Made Wahyu Widyarsana ST., MT., Editor: Garnida Hikmah Kusumawardana

File PDF...