PENGEMBANGAN MODEL FAKTOR KAPASITAS BIAYA UNTUK ESTIMASI BIAYA KONSEPTUAL KONSTRUKSI BANGUNAN GEDUNG

COST CAPACITY FACTOR MODEL DEVELOPMENT FOR BUILDING CONCEPTUAL COST ESTIMATE

Master Theses from JBPTITBPP / 2017-09-27 15:23:31
Oleh : Ayar Fa-Ati Amelia (NIM 250 04 008), S2 - Civil Engineering
Dibuat : 2006-06-00, dengan 9 file

Keyword : Conceptual cost estimate, capacity factor, building
Kepala Subjek : Engineering
Nomor Panggil (DDC) : T 624.029 9 AME

Abstrak :


Pengunaan faktor kapasitas biaya sebagai salah satu metoda estimasi biaya konseptual pada negara maju telah banyak dikenal dan dipergunakan dengan baik dalam industri konstruksi untuk pembuatan fasilitas pabrik proses kimia, peralatan kontrol untuk polusi udara serta bandara. Namun demikian, penggunaan faktor kapasitas biaya ini belum banyak dikembangkan pada konstruksi bangunan gedung, yang banyak dipergunakan di Indonesia dalam estimasi biaya konseptual adalah estimasi parameter menurut fungsi bangunan tersebut. Metoda faktor kapasitas biaya melihat kapasitas yang dimiliki oleh sebuah fasilitas dalam memperhitungkan biaya konstruksi yang sangat terkait dengan perencanaan awal konstruksi. Standar minimal yang digunakan dalam perencanaan awal memberikan gambaran kapasitas yang harus dipenuhi oleh sebuah fungsi bangunan gedung.


Data penelitian yang telah terkumpul kemudian dikelompokkan sesuai fungsi bangunannya. Data bangunan pada penelitian ini adalah bangunan perkantoran pemerintah, bangunan SD, dan Pendidikan Tinggi serta merupakan data historis di wilayah Jawa Barat Pada setiap fungsi bangunan, data diklasifikasikan menurut aturan tertentu untuk melihat karakteristik faktor kapasitasnya. Tinjauan kapasitas pada bangunan gedung dalam penelitian ini adalah kapasitas fisik dan kapasitas fungsional sesuai fungsi bangunannya. Berdasarkan klasifikasi yang dilakukan kemudian diplot ke dalam algoritma antara kapasitas dan biaya. Analisis yang digunakan adalah analisis regresi sederhana. Nilai faktor kapasitas biaya merupakan gradien dari hubungan kapasitas dan biayanya yang memiliki rentang tertentu.


Hasil penelitian menunjukkan kapasitas fisik lebih berpengaruh pada bangunan perkantoran dan pendidikan tinggi sedangkan jumlah murid sebagai kapasitas fungsional berpengaruh pada bangunan SD. Secara umum faktor kapasitas pada bangunan gedung bernilai lebih dari satu menunjukkan peningkatan biaya lebih besar dibandingkan peningkatan kapasitasnya.

Deskripsi Alternatif :

Abstract :


Capacity factor method is well known and widely used in construction industry of developed countries as a method in estimating construction cost of petrochemical plants, airport and other engineered facilities at their preliminary planning stage. In Indonesia, the use of this method, especially for building construction, is still limited and not well developed compared to other method, i.e., parametric cost estimate that is closely related to building functions. This capacity factor method considers design capacity of a facility in estimating the construction cost at its preliminary planning stage. Standardized minimum capacity of a facility is commonly used by architect to set the design capacity of a facility with a particular function.


After collection field research, data is grouped according to building function. The building data in this research is historical data from government offices, elementary schools, and colleges in West Java. The data on each building function is classified according a certain rule to see characteristics of its capacity factor. The building capacity observations in this research are physical capacity and functional capacity according to building function. Based on the classification, capacity and cost will be plotted in algorithm. Analysis method that is used in this research is simple regression. Cost capacity factor is shown by the slope acquired from capacity and cost which have a certain range.


The result of this research shows that physical capacity has more influence to office buildings and colleges, whereas functional capacity shown by the number of students has more on elementary school building. Generally, building capacity factor with a value more of than one shows that the cost increase is more than its capacity increase.

Copyrights : Copyright (c) 2006 by Faculty of Civil and Environmental Engineering ITB. Information Dissemination Right @2008 ITB Central Library, Jl. Ganesha 10 Bandung,40132, Indonesia. Verbatim copying and distribution of this entire article is permitted by author to ITB Central Library in any medium, provided this notice is preserved.

Beri Komentar ?#(1) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Muhamad Abduh, Ir. M.T., Ph.D


    Scanner : Novian Kurniawan
    , Editor: Novian Kurniawan

File PDF...