QUANTITATIVE RISK ASSESSMENT PADA STORAGE TANK STUDI KASUS: CENTRAL GATHERING STATION 10 DURI, PT CHEVRON PACIFIC INDONESIA

QUANTITATIVE RISK ASSESSMENT FOR STORAGE TANK CASE STUDY: CGS 10 DURI, PT CHEVRON PACIFIC INDONESIA

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:40:48
Oleh : ATIKA (NIM : 13105066); Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, S1 - Department of Mechanical Engineering
Dibuat : 2009, dengan 7 file

Keyword : Code API 581 Apendiks O, Risk Based Inspection, Aboveground Storage Tank , AST

Kegiatan risk assessment atau perhitungan resiko harus dilakukan dengan mempertimbangkan berbagai aspek, diantaranya aspek operasi, material, lingkungan, finansial, operator, dan aspek lainnya. Hal ini dilakukan dengan


tujuan untuk mencegah terjadinya kegagalan atau kerusakan yang dapat menimbulkan berbagai dampak yang serius. Sebagai contoh, timbulnya ledakan yang mengancam keselamatan, keruksakan lingkungan, ancaman bahan kimia dan kerugian finansial.


Tugas akhir ini menganalisis dan menghitung nilai resiko dengan menggunakan Code API 581 Apendiks O untuk kegiatan Risk Based Inspection untuk Aboveground Storage Tank (AST) pada industri proses dan migas. Dengan studi kasus yaitu tanki utama pada Oil Treating Plant CGS 10 Duri. Terdapat 7


buah tanki yang dianalisis, dengan 3 jenis tanki, yaitu FWKO, Wash Tank, dan Shipping Tank. Perhitungan resiko ini bertujuan untuk mengetahui tingkat resiko yang ada pada beberapa peralatan yang dijadikan studi kasus. Untuk


mempermudah perhitungan maka dikembangkan program bantu perhitungan (calculation sheet) yang dapat mengolah data secara akurat.


Dari studi kasus didapatkan bahwa risk pada pada studi kasus berada pada kategori medium-high, dengan kategori likelihood berada pada kondisi maksimum. Nilai resiko tanki FWKO adalah $44,076.95/tahun, Wash Tank 15,498.72 dolar /tahun, dan Shipping Tank $12,263.10/tahun. Dari hasil studi parameter didapatkan bahwa dengan meningkatnya nilai korosi dan volume tanki akan menyebabkan kenaikan nilai resiko, sedangkan dengan meningkatnya tingkat inspeksi yang dilakukan akan menurunkan nilai resiko.

Deskripsi Alternatif :

Risk assessment has to be done with consideration of some aspects such as operation, material, environment, financial, operator, etc. This task is done in purpose to prevent failures or damages within the system. These damages can affect seriously to safety and environment, caused by blasting or toxic leakage, and also financial losses caused by operation stoped.


Analysis and calculation was done in order to find the risk level in reference by API 581 Appendix O Code Risk Based Inspection for Aboveground Storage Tanks for Process and Oil & Gas Equipments. The case studies were main tanks


in Oil Treating Plant CGS 10 Duri. There were 7 tanks to be analyzed with 3 type of tanks, which were FWKO Tank, Wash Tank, and Shipping Tank. The purpose of risk calculations is to get the risk level in the studied equipments. To simplify the calculation, a calculation sheet was developed that the data could be calculated accurately.


Risk level result in these tanks was categorized in Medium-High, with the highest category for likelihood of failure. Risk for FWKO Tank is 44,076.95 dollar/year, Wash Tank is $15,498.72/year, and Shipping Tank is $12,263.10/year. From the parameter studies we can conclude that with increasing corrosion rate and tank volume will increase the risk, and in the other hand, increasing inspection level will decrease the risk.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, Editor: Alice Diniarti

File PDF...