Path: TopS1-Final ProjectMechanical Engineering-FTMD2008

PERANCANGAN SISTEM PIPA PENYALUR AIR BAKU KAPASITAS DUA RATUS LITER PER DETIK DARI KALIMALANG SAMPAI KELURAHAN PULO GEBANG

Pipeline Design For Raw Water Distribution With Flow Rate 200 Liter per Second From Kalimalang to Kelurahan Pulo Gebang

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:41:03
Oleh : ARMETRA (NIM 13104065), Central Library Institute Technology Bandung
Dibuat : 2008, dengan 9 file

Keyword : pipa air baku, pipa tanam, analisis crossing, analisis biaya, memilih pompa

Kawasan industri di daerah pantai Jakarta Utara memerlukan air berkualitas baik dan murah dengan kapasitas yang berkelanjutan sepanjang tahun. Sungai kalimalang dinilai mampu untuk memenuhi kebutuhan tersebut. Namun, karena jarak antara sungai kalimalang dan Jakarta Utara jauh, maka dibutuhkan pembuatan sistem pipa penyalur air baku. Pembuatan sistem pipa ini membutuhkan perencanaan dan perancangan yang aman dan ekonomis.

Tujuan perancangan untuk mendapatkan sistem pipa penyalur yang aman dari aspek mekanikal dan murah dari aspek biaya. Perancangan didasarkan pada code & standard AWWA M11 dan ASME B31.3. Jalur yang dirancang adalah dari sungai kalimalang sampai Kel. Pulo Gebang, sebagian besar ditanam di dalam tanah dan berada di sisi Jalan Tol Lingkar Utara Jakarta. Perancangan dilakukan dengan menganalisis gaya internal dan eksternal analisis hidrolik, pemilihan pompa, perhitungan span, serta analisis ongkos produksi. Pemodelan keseluruhan jalur pipa dibuat dengan software CAESAR II dan Pipe Flow Expert.

Pipa yang digunakan berdiameter 16 inch dengan sch. 20 untuk pipa tepi jalan dan sch. 30 untuk pipa menyeberangi jalan. Untuk pipa crossing rel kereta api digunakan casing. Pompa yang digunakan sebanyak 3 unit ditambah 1 unit pompa cadangan, masing-masing pompa memiliki daya 25,3 kW. Biaya produksi per m3 adalah sebesar Rp 2.656 yang masih dibawah harga air di pasaran.

Deskripsi Alternatif :

Industrial area in North Jakarta needs water with good quality and continuous capacity over a year. Kalimalang river, as the main source of water in Jakarta, is considered to fulfill that need. However, the distance of Kalimalang river and North Jakarta is far enough, so it has to be created the distribution system for that raw water. To build the distribution system, design and planning are needed to get the safe and economical system.

The objective of design is to get pipeline distribution system that is safe from mechanical aspect, and economical from cost aspect. Design process is based on code & standards AWWA M11 and ASME B31.3. The route of design is from Kalimalang to Kelurahan Pulo Gebang, mostly are buried on the ground, and at the edge of Lingkar Utara Highway of Jakarta. Design process is being done with analysis of internal pressure, external loads, choosing pump, span limitations, and cost analysis. Modeling of design is made using software CAESAR II and Pipe Flow Expert 2008.

The analysis result shows that 16 inch pipe with sch.20 is used for pipe that buried in the edge of highways, and sch.30 for highways crossing. For railways crossing, pipe are covered with casing. Pump that used for the system has power 25,3 kW. Water production cost per m3 is Rp 2656 that still cheaper from market price.

Copyrights : Copyright Â(c) 2001 by ITB Central Library. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiC
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Ir. H. Bagus Budiwantoro, Editor: Vika A. Kovariansi

File PDF...