Path: Top > S1-Final Project > Mining Engineering-FTTM > 2008

PERENCANAAN PRODUKSI TAMBANG TERBUKA PADA BIJIH MENGGUNAKAN OPTIMASI PIT

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:39:02
Oleh : ANTON RIKY (NIM 12103042), S1 - Department of Mining Engineering
Dibuat : 2008, dengan 8 file

Keyword : optimization, pit optimization, mine planning

Optimasi merupakan proses menjadikan sesuatu keluaran lebih efektif/lebih sempurna dengan melakukan penyesuaian pada masukkan. Jika optimasi itu merupakan proses, maka hasil dari optimasi pit merupakan pit yang telah menjadi lebih efektif dan memiliki keuntungan terbesar (keuntungan = pendapatan – ongkos). Perencanaan tambang dapat dijelaskan dengan membuat suatu rancangan tambang untuk mencapai batas pit akhir dalam jangka waktu tertentu secara aman dan menguntungkan. Dimana didalamnya berisikan juga perancangan batas akhir penambangan, tahapan penambangan, urutan penambangan, penjadualan produksi, dll (hal yang berkaitan dengan geometri). Aspek lainnya meliputi perhitungan kebutuhan alat dan tenaga kerja, perkiraan biaya modal, dan ongkos operasi. Perencanaan tambang memiliki tujuan membuat suatu rencana produksi tam bang untuk sebuah cebakan bijih yang akan menghasilkan aliran kas yang akan memaksimalkan kriteria ekonomik (NPV/ROR) dengan tingkat produksi yang telah ditentukan dan biaya serendah mungkin. Penelitian ini bertujuan untuk mencoba mendapatkan pit yang optimal dan mengetahui dampak perubahan pendapatan pada tambang. Sebagai tindak lanjut hal tersebut maka tugas akhir ini menggunakan dua buah software yaitu NPV Scheduler dan sebuah program sederhana (dijalankan pada fortran). Hal yang akan dilakukan ialah melakukan simulasi perubahan pendapatan baik itu kenaikan maupun penurunan pendapatan. Simulasi tersebut akan dibagi menjadi dua bagian utama. Pertama, menentukan pit yang optimal (menjalankan NPV Scheduler sepenuhnya), dan bagian berikutnya dengan membagi simulasi menjadi tiga skenario untuk NPV Scheduler dan lima skenario untuk program sederhana. Hasil dari penelitian ini menunjukkan optimasi pit dapat menghasilkan pit yang optimal (khususnya dari segi keekonomian). Hasil lainnya memperlihatkan dampak perubahan pendapatan (khususnya penurunan pendapatan) yang mengakibatkan perubahan besar pada tambang.

Deskripsi Alternatif :

Optimization is process turn out something more effective/complete, with proper adjustment for input. If optimization is process, then output of pit optimization is defined as pit effectively finished within highest profit (profit = revenue – cost). Mine planning can be explained with creating mine design that reach ultimate pit limit in a certain periode wit h benefit and safely. Inside also ultimate pit design, pushback, mine sequencing, production scheduling, etc (related with geometry). Another aspects include calculation of equipment and workers, operating and capital cost estimate. Mine Planning has aim in order to mine production planning for ore deposit that will deliver cash flow with maximizing economic criterion (NPV/ROR) at lower cost and fixed production capacity. This research has purpose to get optimal pit and knowing impact of revenue changes. For that, this final assignment using two software which NPV Scheduler and simple program (runs on fortran). This assignment will doing simulation of pit optimal, simulation of revenue changes eather decreasing or increasing revenue. The final assignment will be divided into two main parts. First, generates optimal pit (running NPV Scheduler fully), and for next work divide simulation into three scenarios (NPV Scheduler) and five scenarios (simple program) for simulation of revenue changes. The result of this research showing that pit optimization can generating optimal pit (especially economics view). Another result, showing the impact of revenue changes (especially decresing revenue) with consequently major changes in mine.

Copyrights : Copyright Â(c) 2001 by ITB Central Library. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Rudianto Ekawan, ST., MT., Editor: Vika A. Kovariansi

File PDF...