Path: Top > S1-Final Project > Petroleum Engineering-FTTM > 2008

PREDIKSI KURVA IPR DUA FASA PADA PERIODE PSEUDO STEADY STATE BERDASARKAN DATA TES PADA PERIODE TRANSIEN

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:37:31
Oleh : ADEK SATIM (NIM 12204022), S1 - Department of Petroleum Engineering
Dibuat : 2008, dengan 1 file

Keyword : Uji sumur, Kurva IPR, Well testing, IPR curve

Uji sumur untuk menentukan kemampuan produksi sumur harus mencapai kondisi pseudo steady state mengingat kurva IPR memberikan gambaran produktivitas pada keadaan ini. Waktu uji sumur yang dibutuhkan untuk mencapai kondisi pseudo steady state ditentukan oleh harga permeabilitas lapisan, dimana untuk permeabilitas yang rendah diperlukan waktu yang panjang untuk mencapai pseudo steady state. Tugas akhir ini membahas tentang pengembangan suatu persamaan untuk mengetahui kemampuan suatu sumur produksi pada pseudo steady state berdasarkan pada hasil uji sumur pada kondisi transien. Cara ini dikembangkan dengan menggunakan model sumur tunggal yang dibangun dari Simulator komersial CMG. Model yang dibangun mewakili reservoir solution gas drive dengan harga permeabilitas yang rendah. Dengan menggunakan model ini dikembangkan persamaan kurva IPR pada keadaan transien yang kemudian dikembangkan persamaan peramalan kurva IPR pada kondisi pseudo steady state berdasarkan data uji pada kondisi transien. Persamaan yang dihasilkan dari Tugas Akhir ini masih perlu disempurnakan antara lain dengan membandingkan dengan data uji sumur di lapangan.

Deskripsi Alternatif :

Well testing that determines the well performance theoretically should reach pseudo steady state condition considering IPR curve that describe productivity of well on this condition. The time to reach pseudo steady state condition is influenced by layer permeability whereas low value of permeability will cause long time to reach pseudo steady state condition. This final project discuss about the generation of equation to determine performance on production well at pseudo steady state condition based on well testing result at transient condition. This method is developed from single well model that is built on commercial simulator CMG. This model represents solution gas drive gas reservoir with low permeability. By using this model, IPR on transient condition is generated and developed to pseudo steady state condition IPR based on well testing at transient condition. Development on the equation generated in this final project is still needed, for example by validating this equation with real time well testing result.

Copyrights : Copyright Â(c) 2001 by ITB Central Library. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Ir. Pudjo Sukarno dan Amega Yasutra, M.S., Editor: Vika A. Kovariansi

File PDF...